广东安规检测有限公司-专业生产试验指、灯头量规、插头量规、插座量规、IP淋雨、材料试验机、拉力机
专业的安规检测设备源头制造商紧跟标准——紧跟IEC、UL、ISO各种标准为您报价、设计与生产
创新智能——带遥控器的灼热丝、针焰、燃烧机、IP淋雨试验机,行业独创领先
专业诚信——专业到您吃惊,一直被模仿,从未被超越
全国咨询热线:0769-23600626

UL1574表面轨道灯测试天花

UL1574表面轨道灯测试天花是广东安规根据标准UL1574第53.4节及图53.1设计制作而成

产品详情

UL1574表面轨道灯测试天花是广东安规根据标准UL1574第53.4节及图53.1设计制作而成


53.4.1 The track lighting system assembly to be tested is to consist of three intercept connector samples, two feed connector samples, one luminaire assembly sample, and four 20 inch (0.51 m) long sections of track. The connectors and luminaire assembly samples are to be of the models with the highest measured resistance as specified in 53.2.1. The electrical fittings are to be assembled as shown in Figure 53.1 and mounted to one side of a plywood test ceiling consisting of 1/2 inch (12.7 mm) thick Grade A – C or A – D plywood of such dimensions that the plywood extends at least 1 foot (305 mm) beyond each portion of the network and luminaire assembly. A 4 inch by 1-1/2 inch deep octagonal trade size standard metal outlet box is to be secured inside a wooden box by screws through the back of the outlet box. The wooden box is to be constructed of 2 inch by 4 inch trade size pine. The inside dimensions of the wooden box are to be 4 inches by 3-7/8 inches by 1 inch (102 mm by 98.4 mm by 25.4 mm). The wooden box is to be mounted to the plywood over a 4 inch by 4 inch opening. Each section of track is to be secured to the plywood by two wood screws through openings, each of which is:
a) 3 inches (76.2 mm) from the end of a track section; or b) 1/2 inch from the connector in the end of the track; whichever is the greater distance from the end. The feed connector is to be mounted to or over the outlet box. The side of the plywood to which the track system is not mounted is to be completely covered with a layer of foil-faced R19 glass fiber batt insulation with the non-foil-faced side of the insulation facing the plywood test ceiling. The plywood surface is then to be suspended or supported so that a simulated ceiling mounting of the track assembly results.  
Exception: If, as a result of measuring the resistance of the intercept connectors, a right or left turn intercept connector is determined to have the highest resistance and is to be subjected to the grounding resistance test, two right and one left intercept connector samples may be tested in the test assembly.
轨道灯测试天花


标签: UL1574

联系方式

广东安规检测有限公司

电话:0769-23600626

QQ:7692303

电邮:sales@jcyq.com

地址:广东省东莞市寮步镇凫山兴新街2号1栋101室

采购:UL1574表面轨道灯测试天花

产品推荐/ RELATED PRODUCTS
QQ在线咨询
座机
0769-23600626
手机
13650052332